Refactoring as a Displacement Activity

Refactoring is good right? We constantly read about how we should be writing simple and easy code to do the minimum necessary and refactoring it as we go to improve it and expand what it can do. Unfortunately, this can lead to some really bad habits, especially if it’s used as a displacement activity.

What do I mean by displacement activity? Well lets consider a hideous project that is under specced, under resourced and overdue. Our poor old developer is demotivated and drowning under a sea of requirements that they don’t know how they’re going to implement, but what they have done is written the code that handles the command line arguments. This code works to spec, is even tested and could be considered complete. But, it’s taking user input. It’s not as neat as it could be. In fact it’s quite messy.

So what does our developer do? Do they tackle the next in the long list of requirements and try and get closer to completion, or do they refactor the working code to make it nicer? While we all know they should be doing the former, all to often it’s the latter that happens. Our developer goes off and refactors the working code to make it nicer.

Having seen this happen on a number of occasions it got me to thinking what was going on here. Why mess about with the stuff that works when there is a pile of stuff that doesn’t work to be getting on with. The answer is brutally simple, it’s a psychological trick.

In order to feel that they have had a productive day our developer needs to make progress. By tackling the difficult, as yet unwritten features, the developer is taking a risk. They may not be able to complete the task in the time they’ve allotted. They may run into problems. They may get stuck. They may fail. By refactoring the working code, on the other had, they’re tackling a problem that they know they can solve; after all, they’ve solved it already. What they’re doing now is a refinement.

Of course, once the refinement is completed our developer is still left with the mountain of requirements to complete that they didn’t want to tackle, and they now have less time to complete those requirements, but dealing with that problem has been shifted to something we can deal with tomorrow. In the mean time “progress”, for a given definition of progress, has been made because the existing code is now cleaner. A classic displacement activity.

Taken to its extreme this kind of thinking can lead to making nothing absolutely perfectly. You tend towards, but never actually achieve, the perfect solution for your problem. This is compounded by the fact that as soon as you start dealing with the edges of software development (input and output) things start getting messy. Perfection can’t actually be achieved and you’ll end up swapping one compromise for another ad-infinitum. Annoyingly we know all about this pitfall. the KISS principle and MVPs are all about avoiding this type of displacement and producing something that is important: working code. The irony is that this “perfect code” that we’ve wasted time crafting will no doubt get hacked about later as the system grows and the missing requirements are added. One day we may learn.

Costing and Commitment

One of the hardest aspects of Scrum seems to be the accurate costing of stories. We all know the theory: you break your work into chunks, cost those chunks, and commit to a certain amount of work each week based on costing and velocity. Pure Scrum™ then states that if you do not complete your committed work then Your Sprint Has Failed. All well and good, apart from one small problem: it’s all bollocks.

I’ve long had an issue with the traditional costing/commitment/sprint cycle insofar as it doesn’t translate from theory into the real world. In her recent talk at NorDev, Liz Keogh pointed out that Scrum practitioners are distancing themselves from the word “commitment” and from Scrum Failures as they are causing inherent problems in the process. Allan Kelly recently blogged about how he considers commitment to be harmful. Clearly I’m not alone in my concerns.

As always, when it comes to things like this, I’ve simply borrowed ideas for other people and customised the process to suit me and my team. If this means I’m doing it “wrong” then I make absolutely no apologies for it, it works for us and it works well.

Costing

Developers suck at costing. I mean really suck. It’s like some mental block and I have yet to find a quick and effective way to clear this. Story points are supposed to make developers better at costing because you’re removing the time element and trying to group issues by complexity. That’s lovely on paper, but I’ve found it just confuses developers – oh, we all get the “a Chihuahua is 1 point so a Labrador must be 5 or 8 points” thing, but that’s dogs, visualising the relative size and complexity of code is not quite as simple.

What’s worse is that story points only relate to time once you have a velocity. You can’t have velocity without points and developers generally find it really hard to guesstimate1 without times. Chicken and egg. In the end I just loosely correlated story points and time, making everyone happy. I’ve also made story points really short because once you go past a few days estimates start becoming pure guesses. What we end up with is:

Points Meaning
0 Quicker to do it than cost it.
0.5 One line change.
1 Easily done in an hour.
2 Will take a couple of hours.
3 A morning/afternoons work.
5 Will take most of the day.
8 It’s a days work.
13 Not confident I can do it in a day.
20 Couple of days work.
40 Going to take most of the week.
100 Going to take a couple of weeks.

Notice this is a very loose correlation to time, and it gets looser the larger the story point count. Given these vagaries I will only allow 40 and 100 point costings to be given to bugs. Stories should be broken up into chunks of two days or less so you’ve got a good understanding of what you’re doing and how long it’s going to take2.

With that in mind 40 points really becomes “this is going to be a bitch to fix” and 100 points is saved for when the entire team looks at you blankly when diagnosing the problem: “Err… let me go look at it for a few days and I’ll get back to you“.

Stopping inflation

Story point inflation is a big problem with scrum. Developers naturally want to buy some contingency time and are tempted to pad estimates. Story point deflation is even worse with developers being hopelessly optimistic and then failing to deliver. Throw in the The Business trying to game the system and it’s quickly become a mess. I combat this in a few ways.

Firstly, points are loosely correlated to time. In ideal conditions a developer wants to be completing about 8 points a day. This is probably less once you take meetings, walkups and other distractions into account. While an 8 point story should be costed such as the developer can complete it in a normal day with distractions accounted for, the same doesn’t hold true for a series of 1 point stories. If they’re all about an hour long and there’s an hours worth of distractions in the day then the developer is only getting 7 points done in that day.

Minor fluctuations in average per developer throughput are fine, but when your velocity starts going further out of whack it’s time to speak to everyone and get them to think about how they’re estimating things.

Secondly, points are loosely correlated to time. A developer can track how long it takes them to complete an issue and if they’re consistently under or over estimating it becomes very apparent as the story points bear no correlation to the actual expended effort. A 5 pointer taking 7 hours isn’t a problem, but any more than that and it probably wanted to be an 8 pointer. Make a note, adjust future estimates accordingly. I encourage all my developers to track how long an issue really takes them and to see how that relates to the initial estimate.

Thirdly, costing is done as a group exercise (we play planning poker) and we work on the premise of an “average developer”. Obviously if we take someone who is unfamiliar with the code it’s going to take them longer. You’ll generally find there’s some outlying estimates with someone very familiar with that part of the code giving low estimates and people unfamiliar with it padding the value. We usually come to a consensus fairly quickly and, if we can’t I just take an average.

I am aware that this goes against what Traditional Scrum™ teaches us, but then I’m not practicing that, I’m practicing some mongrel Scrumban process that I made up as I went along.

Velocity and commitment

I use an the average velocity of the past 7 sprints3 adjusted to take into account holiday when planning a sprint. We then pile a load of work into the sprint based on this figure and get to work. Traditionally we’ve said that we’ve committed to that number of story points and issues but only because that’s the terminology that I learned with Scrum. Like everything else, it’s a guestimate. It’s what we hope to do, a line in the sand. There are no sprint failures. What there is is a discussion of why things were not completed and why actual velocity didn’t match expected velocity. Most of the time the reasons are benign and we can move on. If it turns out there are problems or impediments then we can address them. It’s a public discussion and people don’t get to hide.

Epics and Epic Points

The problem with having story points covering such a small time period is that larger pieces of work start costing huge numbers of points. A month is something like 200 points and a year becomes 2500 points. With only 2000 hours in a year we start getting a big disconnect between points and time which The Business will be all over. They’ll start arguing that if a 1 year project is 2500 points then why can’t we have 2500 1 point issues in that time?

To get round this issue we use epic points which are used to roughly cost epics because they’re broken down into stories and properly costed. While story points are educated guesstimates epic points are real finger in the air jobs. They follow the same sequence as story points, but they go up to 1000 (1, 2, 3, 5, 8, 13, 20, 40, 100, 250, 500, 1000). We provide a handy table that lets the business know that if you have an epic with x many points and you lob y developers at the problem then it will take roughly z days/weeks/months. The figures are deliberately wooly and are used for prioritisation of epics, not delivery dates. We’re also very clear on the fact that if 1 developer can do it in 4 weeks, 2 developers can’t do it in 2. That’s more likely to be 3 weeks.

Epic points are malleable and get revisited regularly during the life of an epic. They can go up, down or remain unchanged based on how the team feel about the work that’s left. It’s only as the project nears completion that the epic points and remaining story points start bearing a relationship to each other. Prior to that epic points allow The Business to know if it’s a long way off, or getting closer.


1 What, you think this is based on some scientific method or something? Lovely idea, we’re making educated guesses.

2 I’ve had developers tell me they can’t cost an issue because they didn’t know what’s involved. If you don’t know what’s involved then how can you work on it? Calling it 20 points and hoping for the best isn’t going to work. Instead you need to create a costing task, and spend some time working out what’s involved. Then, when you understand the issue, you can then cost it properly.

3 A figure based purely on the fact that JIRA shows me the past 7 sprints in the velocity view.

Agile In The Real World

No plan of operations extends with any certainty beyond the first contact with the main hostile force.” – Helmuth Carl Bernard Graf von Moltke

I’ve been doing eXtreme Programming (XP) and Agile in one guise or another since the early 2000’s. During that time I’ve been in big teams, small teams, bureaucratic organisations, lean organisations and chaotic organisations. I have never worked in a top down Agile organisation and probably never will. Also, no two teams I have worked in have done Agile the same way. I suspect this is partly to do with the organisations the teams were part of, and partly to do with the teams themselves. This is not a bad thing.

Agile is a toolkit, not a rigid set of structures. As with all toolkits, some tools fit better for certain circumstances than others. A good team will adopt an Agile process that fits them, fits the business they work in and then adapt that process as and when things change (and they will). If you’re looking for a post about “How to do Agile” then this is the wrong place. I can’t tell you, I don’t know your team, or your organisation. Instead this explains how I’ve implemented Agile for our team and our organisation in order to get the maximum benefit.

PDD

Most (all?) discussions on Agile seem to use a sliding scale of Agileness with pure a Waterfall process on the left, a pure Agile process on the right and then place teams somewhere along this axis with very few teams being truly pure Waterfall or pure Agile. I don’t buy this. I think it’s a triangle with Waterfall at one point, Agile at the second, and Panic Driven Development at the third. Teams live somewhere within this triangle.

So what is Panic Driven Development? Panic Driven Development, or PDD is the knee jerk reactions from the business to various external stimuli. There’s no planning process and detailed spec as per Waterfall, there’s no discreet chunks and costing as per Agile, there is just “Do It Now!” because “The sky is falling!“, or “All our competitors are doing it!“, or “It’ll make the company £1,000,0001, or purely “Because I’m the boss and I said so“. Teams high up the PDD axis will often lurch from disaster to disaster never really finishing anything as the Next Big Thing trumps everything else, but even the most Agile team will have some PDD in their lives, it happens every time there is a major production outage.

When I first joined my current company it was almost pure PDD. Worse still, timescales were being determined by people who didn’t have the first clue about how long things would really take. Projects were late (often by many months) and issue tracking was managed by simply ditching any issues over a certain age. In short it was chaos. Chuck in a legacy codebase with some interesting “patterns”, a whole bunch of anti patterns and a serious amount of WTFs and you have the perfect storm: low output and poor quality.

Working on the edge of chaos

One thing I realised very early on was that I was not going to be able to change The Business. The onslaught of new things based on half formed ideas was never going to change and the rapid changes of direction were part of the companies DNA. Rather than fight this we embraced it, with some caveats.

Things change for us, fast. Ideas get discarded, updated and changed in days and the development team needs to keep up. To achieve this we use Scrum… except where we don’t, and use Kanban instead. Don’t worry though, it’s not that complex. 🙂

Scheduled work is done using Scrum. Sprints are a week long and start on a Wednesday2. Short, rapid sprints mean we can change direction fast without knocking the sprint planning for six. If the business want to change direction they only have to wait a few days. Releases generally (but not always) consist of two sprints of work. A release undergoes 2 weeks of QA after leaving development so will generally be in production 4 weeks after the sprint started. If need be we can do a one sprint release with as little as one week QA and have a change out within 3 weeks of it being requested.

Sat on top of that we have a Kanban queue which should remain empty at all times. It is populated with QA failures and critical issues that are either blocking the release, or require patching. Every column on the Kanban board has a constraint of 0 items. Put something in it and it goes red, making it pretty obvious that someone needs to fix something sharpish.

The sprint planning meeting, retrospective and costing are all handled in the same Wednesday morning meeting which lasts an hour. First up we look at the state of the outgoing sprint. We look at what got added to the sprint after it started, and why; what was removed from the sprint, and why; and what wasn’t completed within the timeframe of the sprint, and why. We run a system whereby it’s OK for things to span sprints. Things overrun, things get stalled, and sometimes it’s simply that you had half an hour left in the sprint, added a new issue to work on, but never had enough time to finish it. Any concerns are raised and handled, then the sprint is closed. The next sprint is then planned using a moving average of velocity as guidance for how much work to add. Any time remaining in the meeting is used costing and curating the backlog. Sadly the business rarely attend these meetings meaning we need to be creative when it comes to business sponsors.

Finding Business Sponsors

Unlike traditional Scrum we have two backlogs. With over a decade of technical debt and more new development than we can possibly hope to achieve we have hundreds of issues. Clearly this is unworkable. The majority of these live in the un-prioritised backlog. We know about them, we’ve documented them, but they’re not getting done, and may not even get costed unless someone champions them and gets them pushed into the scrum backlog. The scrum backlog is the realistic backlog. We aim to keep no more than 4 x average velocity worth of work in this backlog which means at any given time it provides a roadmap for the next month. We also make sure everything in the scrum backlog is properly costed meaning sprint planning is incredibly easy; just put the top 25% of the backlog into the sprint, adjusted for holidays and various other factors.

Using this method you very quickly find sponsors coming out of the woodwork. When work is not done people start asking where it is, you can then explain to them that it’s not been prioritised, or it’s being trumped by other work. If they care about the issue then they need to champion it, become the business sponsor and take responsibility for it. They can argue the case for it being moved up the backlog with the business. If they don’t want to do that then clearly the work is not important, so it goes into the un-prioritised backlog to eventually die through lack of interest. Stuff that is already in the un-prioritised backlog can be fished out when a sponsor is found and costing can start.

Bugs generally follow a slightly different process insofar as they will always have a sponsor, even if it’s the testing team. Bugs are never closed unless they are fixed, or cease to be an issue due to other changes. The QA team will regularly revisit all open bugs and re-prioritise or close them as necessary.

Costing

New features are costed using planning poker and we use very small stories. Valid costings are 1 (1 line change), 2, 3, 5, 8, 13 and 20. Our target velocity is between 8 and 13 points per developer per day. Any slower and we’re being too optimistic with our costing, any faster and we’re being too pessimistic. Bearing that in mind a developer should easily handle two 20 point stories in a single sprint with room to spare. Anything larger than 20 points needs to be carved up into multiple stories, or turned into an Epic. We do this because estimates get rapidly poorer once you go past a couple of days work.

Stories are only costed if the team fully understand the issue. If there are questions the issue is noted and the questions taken to the Business Sponsor. Yes, it would be great if they were in the costing meeting and could answer the questions there and then, but it can be a little like herding cats sometimes. The cost to the business sponsor is that the issue isn’t costed and can’t go into a sprint until it is, and it’s a cost they’re incurring by not attending, not that we’re imposing on them.

Stories that exceed 20 points are either quickly split into a couple of stories, or converted to an epic and a costing task raised. This allows time in a sprint for one or more members of the team to find the full set of requirements from the business sponsor and generate the full set of required stories for later costing.

Scope creep can either be added to a story, or a new story created for the creep. If it’s added to an existing story it’s old costing is discarded, and if that story is in the current sprint it’s ejected from the sprint until it’s been re-costed and space made for it. The costing may happen there and then with the team having a quick huddle, or it may need to wait for the next planning meeting.

It’s not a silver bullet

Nothing is written in stone except the maximum velocity of the team. Sprints can start late, end late or end early. Releases can be held back, or bought forward. Issues can be removed from the sprint and replaced with others. We can react to the business, but it’s not a silver bullet. The more the business change their minds the slower throughput gets due to the inertia of changing direction, however, they are now better informed and can see and measure the effects of this which has resulted in a lot less chopping and changing.

Projects are now being delivered on time, however, the timescales are also now realistic, and easily tracked. Projects are becoming better defined as the true cost of them is realised by those proposing them. The output is similar to what it used to be, but is now more focused. Rather than over promise, under deliver and spend months cleaning up the mess certain projects just aren’t even attempted.

The process is continually evolving. We’ve done pure Scrum and pure Kanban before. The model we use took the most useful aspects of both of these systems. As we try new things we’ll take the best bits and adapt them to suit us. No doubt there are Agile Evangelists out there who will balk at one or more aspects of what we do as being wrong. Maybe they are, all I can say is they work for us and the team is happy with how we work. If they’re not, we change it.


1 I have worked on quite a few “million pound” projects or deals. The common denominator is that all of them failed to produce the promised million, often by many orders of magnitude.

2 Why Wednesday? People are more likely to be in. There isn’t that last minute panic on Friday to get everything finished and the sprint doesn’t start on a day where people are catching up after the weekend.